City of Wanneroo Installs Twenty Charging Stations in new Civic Centre Car Park
Twenty charging stations have been installed within the WA City of Wanneroo’s Civic Centre Car Park, and two public stations adjacent on Cafaggio Crescent. The stations are network enabled for connection to any OCPP compatible management system such as Charge Star and fully compatible with load balancing systems such as THOR. Access to the stations can be controlled by RFID card and/or the NEXTCHARGE smart phone application. The Circontrol charging stations were supplied and installed by E-Station and Powerlux WA who provided a turnkey solution.